论文发表
Di H, Zhou S, Xiao J, et al. Investigation of the long-term settlement of a cut-and-cover metro tunnel in a soft deposit[J]. Engineering Geology, 2016, 204: 33-40.(SCI收入)
发布时间 : 2016-01-07

Copyright © 轨道交通结构建养课题组         

上海市嘉定区曹安公路4800号通达楼 邮编201804 电话:021-69583862